Storage buildings
8 tips to keep the temperature stable in your storage building
8 min reading time

A storage building, including a self-build storage building from Kroftman, isn't erected overnight. There's often a longer preparation period involved. At Kroftman, we've been selling various storage solutions, including self-build storage buildings, for 15 years. Of all our storage solutions, a storage building requires the most preparation time. But what exactly is involved in purchasing a self-build storage building, and what steps do you need to take, and in what order? In this blog, you'll learn more about this, as well as the time each step will take. Once you know this, you can better estimate how many weeks it will take for your storage building to be ready for use. Read more about the following 6 steps:
To make the right choices in step 2, it's important that you have already thought about some things. Ask yourself the following questions:


You can assemble your storage building via our quotation tool. This is entirely without obligation. So feel free to compare all possible options by requesting different quotations from us. Ordering at this point in the process is also not practical. You need to know first whether you need to apply for a planning permit and, if so, whether you will receive it. To be able to apply for a permit, you must already know exactly what the storage building will look like. That's why you need to assemble the storage building first. In our quotation tool, you make the following choices:
If you click on 'Send quotation request', you will automatically receive the login details from us within a few minutes, which you can use to view your quotation(s). Once you have made your choice and know what the storage building you want looks like, proceed to step 3 in the process.
Never order a storage building before you are sure you are allowed to place it. Since the end of 2014, the rules for building without a permit in the Netherlands have been relaxed. In this blog, you can read more about the planning permission. Note, however, that laws and regulations can change. Always check the current rules. You can quickly check whether a planning permit is required on the planning permit portal. If you are indeed allowed to build the storage building you want without a planning permit, you do not need a planning permit. The rules from the zoning plan do not apply in that case. Building without a permit does not mean you can build without regulations. The same requirements from the building decree also apply here. Also, pay attention to other laws and regulations that do apply. You are responsible for ensuring that you comply with these rules.
If you need planning permission, you can apply for it with an application form from your municipality. This can be done digitally or in writing. You can also apply for planning permission directly via www.planningpermitportal.nl. The processing time for simple applications is a maximum of eight weeks, with a possible extension of six weeks. You can download the construction drawings of your Kroftman storage building for free on our website for applying for planning permission. Upon request, we also provide the structural calculations for free and entirely without obligation.

Once you have received the approval for your building permit and are sure that you are allowed to construct the storage building, you can order the storage building by:
During the delivery time of the storage building, you can prepare the foundation for the storage building. What exactly you need to do depends on the type of foundation you choose. Our storage buildings can be placed on a concrete foundation, Stelcon plates (prefabricated concrete plates), or another type of hard surface such as asphalt, paving, compacted sand, gravel, or crushed stone.
Concrete foundation
A concrete foundation is the best option if you want to keep your storage building as moisture-free as possible. If properly laid, a concrete foundation provides the best connection with the storage building. We do not lay concrete foundations ourselves. You can hire a construction company of your choice for this. In our construction drawings, you will find two standard foundation plans that you can provide to your construction company. Kroftman provides a strength calculation, including snow and wind loads, for every storage building free of charge. Based on the bearing capacity of the ground and the strength calculations of the storage building, an engineer will know what foundation is needed for your new storage building.
A well-laid concrete foundation is flat, without bumps, and level. The foundation reaches the frost line and is a few centimeters above ground level. Furthermore, the foundation is a few centimeters larger than the base rail. This is necessary to securely anchor the base rail to the ground. At the same time, the foundation should not protrude too far. The concrete foundation must exactly match the surface dimensions as stated in our construction drawing. A Kroftman storage building is equipped with a water stop. Only if you adhere to our measurements will it fall exactly over the edge of the foundation. This water stop ensures that rainwater is drained away. Without a water stop, water would remain on the protruding edge of the foundation, with the risk of seeping under the base rail into the storage building.
.png?width=655&height=236&name=Waterslag%20kort%20%20(1).png)
Stelcon plates (prefabricated concrete plates)
For our storage building, we advise you to create a spacious floor field of prefabricated concrete plates measuring 200 x 200 x 16 cm in a sand bed of at least 45 cm, or deeper. The depth of the sand bed must at least reach the frost line. This frost line varies by location. If groundwater under the foundation freezes and thaws again, it causes movement, resulting in the foundation becoming loose. The concrete surface must be larger than the surface dimensions of the storage building according to the Kroftman construction drawing. We advise placing the concrete plates in the middle under the walls to prevent the plates from tipping up. In any case, there must be enough space to secure the anchor bolts in the base rail without risking the concrete from cracking. The mounting surface for the storage building must be level. Any irregularities may be a maximum of 5 mm high or deep, and the slope in one direction and a maximum of 1 cm per meter. You cannot place a storage building on a concave, convex, or skew surface. You are responsible for a correct construction (such as subfloor and plate thickness) of the prefabricated concrete floor. You will receive a 'simple' water stop from us to drain rainwater that runs down along the walls away from the storage building.

Another type of hard surface with ground pins
The surface where you place the storage building must be level with a slope of maximum 1 cm per meter in maximum one direction. A curved surface is not possible. You must fill in the slope in the mounting surface before placing the storage building. It is difficult to level these hard surfaces over a large area. As a result, the storage building will fit less well. If you opt for quality, we advise you to place larger storage buildings on a concrete foundation. This will cost a bit more, but there are also costs associated with a large number of ground pins. However, a concrete foundation will provide you with a better quality surface for your storage building.
Building site
You can assemble your storage building yourself or hire a company to do it for you. If you outsource the assembly, make sure to arrange this well in advance to avoid delays. Due to the shortage of technical personnel, there are often waiting times. Whether you choose self-assembly or outsourcing, make sure your construction site has the following provisions:
The moment has arrived, your storage building has arrived at your location. You will receive a detailed assembly manual with your self-build storage building, including many detailed drawings. The assembly time of a storage building is listed on our website. If you go to the storage building of your choice, you will see the tab 'specifications'. Here, under the heading 'average assembly time with do-it-yourself assembly with 4 people', you will find how many days it takes to fully assemble the storage building. The two biggest challenges when assembling a self-build storage building are ensuring a level surface and installing the overhead door.

Installing an overhead door requires specialist knowledge. We have instructional videos showing you how to install an overhead door. By law, you must have an electrically operated industrial door installed by a specialist and the door must be inspected annually. That is also the reason why you receive a sticker with the date of the next inspection (1 year after installation) which you stick on the door after installation. After each inspection, a new sticker is placed on the door. If you fail to do this, it is unlikely that anyone will check. However, if an accident occurs with this door because it is not properly maintained, you will be liable. The same applies to our warranty conditions for the door and motor. These remain valid only with correct installation and annual maintenance of the door and motor.
It is clear that a storage building does not appear overnight. The steps you have to go through take time. To give you an idea of how much time, we have compiled an overview of the (estimated) duration. We do not include Step 1 and 2 (use of the storage building & assembling the storage building) in this. You can then estimate when to take Step 3 to have your storage building available at the right time. In the example below, we assume 8 weeks for the building permit and 12 weeks for the delivery time of the storage building.
You can see that the whole process takes about half a year. If you want to build your storage building in April, you will need to apply for the building permit around mid-October. At least, if everything goes as planned. Perhaps you will receive the building permit within four weeks and the delivery time of your storage building turns out to be only eight weeks. You will need to build in some flexibility. If you don't have an exact deadline yourself, you don't need to worry about the month in which you build your storage building. This is possible in any season.
If you want to know more about the cost of a storage building or the installation costs, please feel free to fill out our quotation tool.
We hope the above information helps you make an informed decision. If you want to know exactly what the storage building of your choice will cost, please fill out our quotation tool without any obligation. In the last question, please enter your postal code so that we can calculate the transport costs. This will result in a quotation that we will send to you by email, showing you at a glance what your storage building will cost, including the transport costs. You can create multiple quotations and check different options. This way, you can compare them effectively.
If you still have questions, we are happy to assist you further.